A borewell can be of help to a housing society to meet its daily water needs, especially when municipal supply is inadequate. But there are regulatory obligations for pumping groundwater. The managing committee should be aware of the permissions, limits of extraction and compliance requirements for a new borewell or for continuing to use an existing borewell before it is drilled. This helps to avoid legal complications and unpleasant surprises.

Who Needs CGWA Permission for Borewell Use?
The Central Ground Water Authority (CGWA) regulates groundwater extraction across India. Not everyone who digs a borewell has to apply, so the first step is checking which group you fall into.
Permission is required for:
- Industries and commercial enterprises
- Infrastructure projects
- Mining operations
These usually need an NOC when they extract more than 10 m³ of groundwater a day.
Permission is not required for:
- Purely household users
- Agriculture
- Small domestic users with a non-energised well, or a single tubewell of 2 HP or less
Residential societies sit between these groups.
When Does a Housing Society Need CGWA Permission for Borewell Extraction?
That depends on how much groundwater you’re pumping out daily.
- Up to 20 m³ a day for drinking and domestic use: usually exempt, provided you have a rainwater harvesting system installed.
- Above 20 m³ a day: you have to apply for a CGWA NOC.
- Swimming pools or commercial setups without proper clearance: NOC is required here as well.
- New apartments above 20 m³ a day: a Sewage Treatment Plant (STP) is generally mandatory, and the treated water is reused for flushing and green belts
Here is an example. A borewell that pumps around 25,000 litres per day has a capacity of 25 m³. This is more than 20 m³, which means the society needs to apply.
Check local state and municipal rules
Central rules are the base, not the whole picture. Municipal corporations, development authorities and state groundwater departments can ask for a drilling permit, local registration or specific structural compliance. Ask your local office before the rig arrives, not after.
What Are the CGWA Guidelines for Groundwater Extraction in Housing Societies?
The CGWA guidelines for groundwater extraction set these conditions for urban apartments and group housing societies that use groundwater:
- An NOC from the BhuNeer portal when the exemption limit is crossed
- A Sewage Treatment Plant for new projects above 20 m³ a day
- Abstraction charges based on the volume withdrawn, mainly in safe, semi-critical and critical assessment units
- Campus and rooftop rainwater harvesting
- Telemetry-compatible digital flow meters on the abstraction structure
How to Apply for CGWA Permission for Borewell Use?
All applications, renewals and fee payments are handled online on the BhuNeer portal. The older NOCAP portal is closed, so do not look for it. Getting CGWA permission for borewell takes five steps.
- Check your category: Confirm the assessment unit or block category of your site on the CGWA portal.
- Calculate water demand: Work out your daily requirement correctly. Do not overestimate, because charges depend on volume.
- Gather documents: Keep the papers listed below ready before you log in.
- Submit online and pay: File the application on BhuNeer and pay the applicable fee. A fresh NOC filing can cost ₹10,000 depending on category.
- Wait for evaluation: Authorities carry out a technical evaluation and a site inspection if needed. Approval generally takes 45 to 60 days.
What Documents Are Required for a CGWA Borewell NOC?
- Site plan or location map with exact borewell coordinates
- Land ownership or lease documents, and society registration proof
- Water requirement calculation and water balance chart
- Hydrogeological report, if your block category or extraction quantity needs one
- NABL-accredited water testing report
- Details of rooftop rainwater harvesting and groundwater recharge structures
- Flow meter and piezometer installation details
What Are the CGWA NOC Fees and Groundwater Abstraction Charges?
CGWA NOC fees have two parts. The first is a non-refundable filing fee, paid through the Bharatkosh government portal. It depends on your category and volume. The second is the groundwater abstraction charge, which depends on how much water you draw. For urban residential apartments and group housing societies, the charges are:
- Up to 25 m³: free
- Above 25 m³ and below 200 m³ a day (26 to 50 m³ in the monthly slab): ₹1 per m³
- Higher tiers (above 50 m³ a month): ₹2 per m³
The slabs appear per day in some places and per month in others, so read the current schedule on the portal before you set a budget.
Two more numbers are worth knowing. A 50% rebate on abstraction charges can apply when your artificial recharge and rainwater harvesting structures are working and verified by CGWA. On the other side, illegal extraction or a missed renewal can bring an environmental compensation penalty starting at ₹1,00,000.
Knowing the CGWA NOC fees early helps the committee plan the amount before the AGM instead of after it.
What Are the Compliance Requirements After Getting CGWA Permission?
CGWA permission for borewell is not the end of the paperwork. The NOC comes with conditions.
- Digital flow meters: Install tamper-proof meters with telemetry within 30 to 90 days of receiving the NOC, and report the installation to CGWA.
- Piezometers: Build observation wells to track groundwater levels.
- Rainwater harvesting and water audits: Carry them out as your category requires.
- Validity and renewal: An NOC is typically valid for 2 to 3 years. Renew it before it expires.
A small tip: put the expiry date on the committee calendar the day the NOC arrives. Most penalties come from missed dates, not refusals.
Manage Daily Operations with NoBrokerHood Society Management System
Running a housing society goes beyond collecting maintenance charges and attending to residents' demands. Committees are required to keep essential records, coordinate staff and communicate with them regarding facilities in the society. A housing society management system can bring all these processes under one roof and make the process of management simpler. Some of the features provided by NoBrokerHood can be used for managing various aspects of the housing society.
Features include:
- Document Management: Keeps essential documents and records of the society in digital form for access by authorised members.
- Accounting Management: Keeps track of maintenance charges collected, expenses, outstanding dues and financial transactions.
- Complaint Management: Residents can report their complaints and monitor their status.
- Communication Management: Shares notices, reminders and important updates with residents.
- Staff Management: Keeps a record of staff attendance and monitors daily activities.
These features help committees keep society records organised and coordinate routine tasks more efficiently.


